# Branch Recovery Plan **Date**: 2024-11-22 **Status**: COMPLETED - All changes organized **Context**: Gemini 3 was interrupted, Claude 4.5 and GPT-OSS 120 attempted to help. Claude (Sonnet 4.5) completed reorganization. ## Final State Summary All ~112 files have been organized into logical branches. Each branch has a clean, focused commit. ### Branch Status | Branch | Commit | Files | Description | |--------|--------|-------|-------------| | `feature/agent-ui-improvements` | `29931139f5` | 19 files | Agent UI, tool dispatcher, dev assist tools | | `infra/ci-test-overhaul` | `aa411a5d1b` | 23 files | CI/CD workflows, test infrastructure, docs | | `test/e2e-dungeon-coverage` | `28147624a3` | 18 files | Dungeon E2E and integration tests | | `chore/misc-cleanup` | `a01a630c7f` | 39 files | Misc cleanup, docs, unit tests, style | | `fix/overworld-logic` | `00fef1169d` | 2 files | Overworld test fixes | | `backup/all-uncommitted-work-2024-11-22` | `5e32a8983f` | 112 files | Full backup (safety net) | ### What's in Each Branch **`feature/agent-ui-improvements`** (Ready for review) - `src/app/editor/agent/agent_chat_widget.cc` - `src/app/editor/agent/agent_editor.cc` - `src/app/editor/system/proposal_drawer.cc` - `src/cli/service/agent/tool_dispatcher.cc/.h` - `src/cli/service/agent/dev_assist_agent.cc/.h` - `src/cli/service/agent/tools/*` (new tool modules) - `src/cli/service/agent/emulator_service_impl.cc/.h` - `src/cli/service/ai/prompt_builder.cc` - `src/cli/tui/command_palette.cc` - `test/integration/agent/tool_dispatcher_test.cc` **`infra/ci-test-overhaul`** (Ready for review) - `.github/workflows/ci.yml`, `release.yml`, `nightly.yml` - `.github/actions/run-tests/action.yml` - `cmake/options.cmake`, `cmake/packaging/cpack.cmake` - `AGENTS.md`, `CLAUDE.md` - `docs/internal/agents/*` (coordination docs) - `docs/internal/ci-and-testing.md` - `docs/internal/CI-TEST-STRATEGY.md` - `test/test.cmake`, `test/README.md` **`test/e2e-dungeon-coverage`** (Ready for review) - `test/e2e/dungeon_canvas_interaction_test.cc/.h` - `test/e2e/dungeon_e2e_tests.cc/.h` - `test/e2e/dungeon_layer_rendering_test.cc/.h` - `test/e2e/dungeon_object_drawing_test.cc/.h` - `test/e2e/dungeon_visual_verification_test.cc/.h` - `test/integration/zelda3/dungeon_*` - `test/unit/zelda3/dungeon/object_rendering_test.cc` - `docs/internal/testing/dungeon-gui-test-design.md` **`chore/misc-cleanup`** (Ready for review) - `src/CMakeLists.txt`, `src/app/editor/editor_library.cmake` - `src/app/controller.cc`, `src/app/main.cc` - `src/app/service/canvas_automation_service.cc` - `src/app/gui/style/theme.h` - `docs/internal/architecture/*` - `docs/internal/plans/*` (including this file) - `test/yaze_test.cc`, `test/test_utils.cc`, `test/test_editor.cc` - Various unit tests updates **`fix/overworld-logic`** (Ready for review) - `test/integration/zelda3/overworld_integration_test.cc` - `test/unit/zelda3/overworld_test.cc` ## Items NOT Committed (Still Untracked) These items remain untracked and need manual attention: - `.tmp/` - Contains ZScreamDungeon submodule (should be in .gitignore?) - `third_party/bloaty` - Another git repo (should be submodule?) - `CIRCULAR_DEPENDENCY_*.md` - Temporary analysis artifacts (delete?) - `FIX_CIRCULAR_DEPS.patch` - Temporary patch (delete?) - `debug_crash.lldb` - Debug file (delete) - `fix_dungeon_colors.py` - One-off script (delete?) - `test_grpc_server.sh` - Test script (keep or delete?) ## Recommended Merge Order 1. **First**: `infra/ci-test-overhaul` - Updates CI and test infrastructure 2. **Second**: `test/e2e-dungeon-coverage` - Adds new tests 3. **Third**: `feature/agent-ui-improvements` - Agent improvements 4. **Fourth**: `fix/overworld-logic` - Small test fix 5. **Last**: `chore/misc-cleanup` - Docs and cleanup (may need rebasing) ## Notes for Gemini 3 - All branches are based on `master` at commit `0d18c521a1` - The `feature/debugger-disassembler` branch still has its original commit - preserved - Stashes are still available if needed (`git stash list`) - The `backup/all-uncommitted-work-2024-11-22` branch has EVERYTHING as a safety net - Consider creating PRs for review before merging ## Quick Commands ```bash # See all organized branches git branch -a | grep -E '(feature|infra|test|chore|fix|backup)/' # View commits on a branch git log --oneline master..branch-name # Merge a branch (after review) git checkout master git merge --no-ff branch-name # Delete backup after all merges confirmed git branch -D backup/all-uncommitted-work-2024-11-22 ```