- Updated README.md to reflect the completion of IT-01 and the transition to end-to-end validation phase. - Introduced a new end-to-end test script (scripts/test_harness_e2e.sh) for validating all RPC methods of the ImGuiTestHarness gRPC service. - Implemented dynamic test functionality in ImGuiTestHarnessService for Type, Wait, and Assert methods, utilizing ImGuiTestEngine. - Enhanced error handling and response messages for better clarity during test execution. - Updated existing methods to support dynamic test registration and execution, ensuring robust interaction with the GUI elements.
6.3 KiB
6.3 KiB
Documentation Consolidation - October 2, 2025
Summary
Consolidated z3ed documentation by removing redundant summaries and merging reference information into core documents.
Files Removed (5)
Session Summaries (Superseded by STATE_SUMMARY_2025-10-01.md)
- ✅ IT-01-PHASE2-COMPLETION-SUMMARY.md - Phase 2 completion details (now in implementation plan)
- ✅ TEST-HARNESS-QUICK-REFERENCE.md - gRPC command reference (now in implementation plan)
- ✅ PROGRESS_SUMMARY_2025-10-01.md - Session progress (now in STATE_SUMMARY)
- ✅ CLEANUP_SUMMARY_2025-10-01.md - Earlier cleanup log (superseded)
- ✅ QUICK_START_PHASE2.md - Quick start guide (now in implementation plan)
Files Retained (11)
Core Documentation (3)
- README.md - Navigation and overview
- E6-z3ed-cli-design.md - High-level design and vision
- E6-z3ed-implementation-plan.md - Master task tracking ⭐ UPDATED
State & Progress (1)
- STATE_SUMMARY_2025-10-01.md - 📊 PRIMARY REFERENCE - Complete current state
Implementation Guides (3)
- IT-01-grpc-evaluation.md - Decision rationale for gRPC choice
- IT-01-getting-started-grpc.md - Step-by-step implementation
- IT-01-PHASE2-IMPLEMENTATION-GUIDE.md - Detailed Phase 2 code examples
- DEPENDENCY_MANAGEMENT.md - Cross-platform dependency strategy
Technical Reference (2)
- GRPC_TECHNICAL_NOTES.md - Build issues and solutions
- GRPC_TEST_SUCCESS.md - Complete testing validation log
Other (1)
- FILE_MODIFICATION_CHECKLIST.md - Build system modification checklist
Changes Made to Core Documents
E6-z3ed-implementation-plan.md ⭐ UPDATED
Added Sections:
-
IT-01 Phase 2 Completion Details:
- Updated status: Phase 1 ✅ | Phase 2 ✅ | Phase 3 📋
- Completed tasks with time estimates
- Key learnings about ImGuiTestEngine API
- Testing results (server startup, Ping RPC)
- Issues fixed with solutions
-
IT-01 Quick Reference:
- Start YAZE with test harness commands
- All 6 RPC examples with grpcurl
- Troubleshooting tips (port conflicts, flag naming)
- Ready-to-copy-paste commands
-
Phase 3 & 4 Detailed Plans:
- Phase 3: Full ImGuiTestEngine Integration (6-8 hours)
- ImGuiTestEngine initialization timing fix
- Complete Click/Type/Wait/Assert RPC implementations
- End-to-end testing workflow
- Phase 4: CLI Integration & Windows Testing (4-5 hours)
- Phase 3: Full ImGuiTestEngine Integration (6-8 hours)
Updated Content:
- Task backlog: IT-01 status changed from "In Progress" to "Done" (Phase 1+2)
- Immediate next steps: Updated from "Week of Oct 1-7" to "Week of Oct 2-8"
- Priority 1: Changed from "ACTIVE" to "NEXT" (Phase 3)
Before vs After
Before (16 files)
docs/z3ed/
├── Core (3): README, design, plan
├── Session Logs (5): IT-01 completion, test harness ref, progress, cleanup, quick start
├── Guides (3): IT-01 eval, IT-01 start, IT-01 Phase 2 guide
├── Technical (2): GRPC notes, GRPC test success
├── State (1): STATE_SUMMARY
└── Other (2): dependency mgmt, file checklist
After (11 files)
docs/z3ed/
├── Core (3): README, design, plan ⭐
├── State (1): STATE_SUMMARY
├── Guides (3): IT-01 eval, IT-01 start, IT-01 Phase 2 guide
├── Technical (2): GRPC notes, GRPC test success
└── Other (2): dependency mgmt, file checklist
Benefits
1. Single Source of Truth
- E6-z3ed-implementation-plan.md now has complete IT-01 Phase 1+2+3 details
- All Phase 2 completion info, quick reference commands, and Phase 3 plans in one place
- No need to cross-reference multiple summary files
2. Reduced Redundancy
- Removed 5 redundant summary documents (31% reduction)
- All essential information preserved in core documents
- Easier maintenance with fewer files to update
3. Clear Navigation
- Core documents clearly marked with ⭐
- Quick reference section for immediate usage
- Implementation plan is comprehensive single reference
4. Historical Preservation
- STATE_SUMMARY_2025-10-01.md preserved for historical context
- GRPC_TEST_SUCCESS.md kept as detailed validation log
- No loss of information, just better organization
What's Where Now
For New Contributors
- Start here:
STATE_SUMMARY_2025-10-01.md- Complete architecture overview - Then read:
E6-z3ed-implementation-plan.md- Current tasks and priorities
For Active Development
- IT-01 Phase 3:
E6-z3ed-implementation-plan.md- Section 3, Priority 1 - Quick commands:
E6-z3ed-implementation-plan.md- IT-01 Quick Reference section - Detailed code:
IT-01-PHASE2-IMPLEMENTATION-GUIDE.md- Phase 2 implementation examples
For Troubleshooting
- Build issues:
GRPC_TECHNICAL_NOTES.md- gRPC compilation problems - Testing:
GRPC_TEST_SUCCESS.md- Complete test validation log - Dependencies:
DEPENDENCY_MANAGEMENT.md- Cross-platform strategy
Verification
# Files removed
$ cd /Users/scawful/Code/yaze/docs/z3ed
$ ls -1 *.md | wc -l
11
# Core docs updated
$ grep -c "Phase 2.*COMPLETE" E6-z3ed-implementation-plan.md
2
# Quick reference added
$ grep -c "IT-01 Quick Reference" E6-z3ed-implementation-plan.md
1
Next Session Quick Start
# Read current state
cat docs/z3ed/STATE_SUMMARY_2025-10-01.md
# Check IT-01 Phase 3 tasks
grep -A 30 "Phase 3: Full ImGuiTestEngine Integration" docs/z3ed/E6-z3ed-implementation-plan.md
# Copy-paste test commands
grep -A 40 "IT-01 Quick Reference" docs/z3ed/E6-z3ed-implementation-plan.md
Impact on Development
Improved Developer Experience
- Before: Check 3-4 files to get complete IT-01 status (completion summary, quick ref, implementation plan)
- After: Check 1 file (
E6-z3ed-implementation-plan.md) for everything
Faster Onboarding
- New developers have clear entry point (STATE_SUMMARY)
- All reference commands in one place (implementation plan)
- No confusion about which document is authoritative
Better Maintenance
- Update status in one place instead of multiple summaries
- Easier to keep documentation in sync
- Clear separation: design → planning → implementation → testing
Consolidation Date: October 2, 2025
Files Removed: 5
Files Updated: 1 (E6-z3ed-implementation-plan.md)
Files Retained: 11
Status: ✅ Complete - Documentation streamlined and consolidated