- Updated README.md to reflect the completion of IT-01 and the transition to end-to-end validation phase. - Introduced a new end-to-end test script (scripts/test_harness_e2e.sh) for validating all RPC methods of the ImGuiTestHarness gRPC service. - Implemented dynamic test functionality in ImGuiTestHarnessService for Type, Wait, and Assert methods, utilizing ImGuiTestEngine. - Enhanced error handling and response messages for better clarity during test execution. - Updated existing methods to support dynamic test registration and execution, ensuring robust interaction with the GUI elements.
183 lines
6.3 KiB
Markdown
183 lines
6.3 KiB
Markdown
# Documentation Consolidation - October 2, 2025
|
|
|
|
## Summary
|
|
|
|
Consolidated z3ed documentation by removing redundant summaries and merging reference information into core documents.
|
|
|
|
## Files Removed (5)
|
|
|
|
### Session Summaries (Superseded by STATE_SUMMARY_2025-10-01.md)
|
|
1. ✅ **IT-01-PHASE2-COMPLETION-SUMMARY.md** - Phase 2 completion details (now in implementation plan)
|
|
2. ✅ **TEST-HARNESS-QUICK-REFERENCE.md** - gRPC command reference (now in implementation plan)
|
|
3. ✅ **PROGRESS_SUMMARY_2025-10-01.md** - Session progress (now in STATE_SUMMARY)
|
|
4. ✅ **CLEANUP_SUMMARY_2025-10-01.md** - Earlier cleanup log (superseded)
|
|
5. ✅ **QUICK_START_PHASE2.md** - Quick start guide (now in implementation plan)
|
|
|
|
## Files Retained (11)
|
|
|
|
### Core Documentation (3)
|
|
- **README.md** - Navigation and overview
|
|
- **E6-z3ed-cli-design.md** - High-level design and vision
|
|
- **E6-z3ed-implementation-plan.md** - Master task tracking ⭐ **UPDATED**
|
|
|
|
### State & Progress (1)
|
|
- **STATE_SUMMARY_2025-10-01.md** - 📊 **PRIMARY REFERENCE** - Complete current state
|
|
|
|
### Implementation Guides (3)
|
|
- **IT-01-grpc-evaluation.md** - Decision rationale for gRPC choice
|
|
- **IT-01-getting-started-grpc.md** - Step-by-step implementation
|
|
- **IT-01-PHASE2-IMPLEMENTATION-GUIDE.md** - Detailed Phase 2 code examples
|
|
- **DEPENDENCY_MANAGEMENT.md** - Cross-platform dependency strategy
|
|
|
|
### Technical Reference (2)
|
|
- **GRPC_TECHNICAL_NOTES.md** - Build issues and solutions
|
|
- **GRPC_TEST_SUCCESS.md** - Complete testing validation log
|
|
|
|
### Other (1)
|
|
- **FILE_MODIFICATION_CHECKLIST.md** - Build system modification checklist
|
|
|
|
## Changes Made to Core Documents
|
|
|
|
### E6-z3ed-implementation-plan.md ⭐ UPDATED
|
|
|
|
**Added Sections**:
|
|
1. **IT-01 Phase 2 Completion Details**:
|
|
- Updated status: Phase 1 ✅ | Phase 2 ✅ | Phase 3 📋
|
|
- Completed tasks with time estimates
|
|
- Key learnings about ImGuiTestEngine API
|
|
- Testing results (server startup, Ping RPC)
|
|
- Issues fixed with solutions
|
|
|
|
2. **IT-01 Quick Reference**:
|
|
- Start YAZE with test harness commands
|
|
- All 6 RPC examples with grpcurl
|
|
- Troubleshooting tips (port conflicts, flag naming)
|
|
- Ready-to-copy-paste commands
|
|
|
|
3. **Phase 3 & 4 Detailed Plans**:
|
|
- Phase 3: Full ImGuiTestEngine Integration (6-8 hours)
|
|
- ImGuiTestEngine initialization timing fix
|
|
- Complete Click/Type/Wait/Assert RPC implementations
|
|
- End-to-end testing workflow
|
|
- Phase 4: CLI Integration & Windows Testing (4-5 hours)
|
|
|
|
**Updated Content**:
|
|
- Task backlog: IT-01 status changed from "In Progress" to "Done" (Phase 1+2)
|
|
- Immediate next steps: Updated from "Week of Oct 1-7" to "Week of Oct 2-8"
|
|
- Priority 1: Changed from "ACTIVE" to "NEXT" (Phase 3)
|
|
|
|
## Before vs After
|
|
|
|
### Before (16 files)
|
|
```
|
|
docs/z3ed/
|
|
├── Core (3): README, design, plan
|
|
├── Session Logs (5): IT-01 completion, test harness ref, progress, cleanup, quick start
|
|
├── Guides (3): IT-01 eval, IT-01 start, IT-01 Phase 2 guide
|
|
├── Technical (2): GRPC notes, GRPC test success
|
|
├── State (1): STATE_SUMMARY
|
|
└── Other (2): dependency mgmt, file checklist
|
|
```
|
|
|
|
### After (11 files)
|
|
```
|
|
docs/z3ed/
|
|
├── Core (3): README, design, plan ⭐
|
|
├── State (1): STATE_SUMMARY
|
|
├── Guides (3): IT-01 eval, IT-01 start, IT-01 Phase 2 guide
|
|
├── Technical (2): GRPC notes, GRPC test success
|
|
└── Other (2): dependency mgmt, file checklist
|
|
```
|
|
|
|
## Benefits
|
|
|
|
### 1. Single Source of Truth
|
|
- **E6-z3ed-implementation-plan.md** now has complete IT-01 Phase 1+2+3 details
|
|
- All Phase 2 completion info, quick reference commands, and Phase 3 plans in one place
|
|
- No need to cross-reference multiple summary files
|
|
|
|
### 2. Reduced Redundancy
|
|
- Removed 5 redundant summary documents (31% reduction)
|
|
- All essential information preserved in core documents
|
|
- Easier maintenance with fewer files to update
|
|
|
|
### 3. Clear Navigation
|
|
- Core documents clearly marked with ⭐
|
|
- Quick reference section for immediate usage
|
|
- Implementation plan is comprehensive single reference
|
|
|
|
### 4. Historical Preservation
|
|
- STATE_SUMMARY_2025-10-01.md preserved for historical context
|
|
- GRPC_TEST_SUCCESS.md kept as detailed validation log
|
|
- No loss of information, just better organization
|
|
|
|
## What's Where Now
|
|
|
|
### For New Contributors
|
|
- **Start here**: `STATE_SUMMARY_2025-10-01.md` - Complete architecture overview
|
|
- **Then read**: `E6-z3ed-implementation-plan.md` - Current tasks and priorities
|
|
|
|
### For Active Development
|
|
- **IT-01 Phase 3**: `E6-z3ed-implementation-plan.md` - Section 3, Priority 1
|
|
- **Quick commands**: `E6-z3ed-implementation-plan.md` - IT-01 Quick Reference section
|
|
- **Detailed code**: `IT-01-PHASE2-IMPLEMENTATION-GUIDE.md` - Phase 2 implementation examples
|
|
|
|
### For Troubleshooting
|
|
- **Build issues**: `GRPC_TECHNICAL_NOTES.md` - gRPC compilation problems
|
|
- **Testing**: `GRPC_TEST_SUCCESS.md` - Complete test validation log
|
|
- **Dependencies**: `DEPENDENCY_MANAGEMENT.md` - Cross-platform strategy
|
|
|
|
## Verification
|
|
|
|
```bash
|
|
# Files removed
|
|
$ cd /Users/scawful/Code/yaze/docs/z3ed
|
|
$ ls -1 *.md | wc -l
|
|
11
|
|
|
|
# Core docs updated
|
|
$ grep -c "Phase 2.*COMPLETE" E6-z3ed-implementation-plan.md
|
|
2
|
|
|
|
# Quick reference added
|
|
$ grep -c "IT-01 Quick Reference" E6-z3ed-implementation-plan.md
|
|
1
|
|
```
|
|
|
|
## Next Session Quick Start
|
|
|
|
```bash
|
|
# Read current state
|
|
cat docs/z3ed/STATE_SUMMARY_2025-10-01.md
|
|
|
|
# Check IT-01 Phase 3 tasks
|
|
grep -A 30 "Phase 3: Full ImGuiTestEngine Integration" docs/z3ed/E6-z3ed-implementation-plan.md
|
|
|
|
# Copy-paste test commands
|
|
grep -A 40 "IT-01 Quick Reference" docs/z3ed/E6-z3ed-implementation-plan.md
|
|
```
|
|
|
|
## Impact on Development
|
|
|
|
### Improved Developer Experience
|
|
- **Before**: Check 3-4 files to get complete IT-01 status (completion summary, quick ref, implementation plan)
|
|
- **After**: Check 1 file (`E6-z3ed-implementation-plan.md`) for everything
|
|
|
|
### Faster Onboarding
|
|
- New developers have clear entry point (STATE_SUMMARY)
|
|
- All reference commands in one place (implementation plan)
|
|
- No confusion about which document is authoritative
|
|
|
|
### Better Maintenance
|
|
- Update status in one place instead of multiple summaries
|
|
- Easier to keep documentation in sync
|
|
- Clear separation: design → planning → implementation → testing
|
|
|
|
---
|
|
|
|
**Consolidation Date**: October 2, 2025
|
|
**Files Removed**: 5
|
|
**Files Updated**: 1 (E6-z3ed-implementation-plan.md)
|
|
**Files Retained**: 11
|
|
**Status**: ✅ Complete - Documentation streamlined and consolidated
|